Project Gallery

Real Jobs. Real Results.

Every project below is a real drainage problem we solved for a homeowner in Middlesex, Monmouth & Ocean Counties, NJ. See the before and after for yourself.

Jackson, NJ

Standing Water — Solved Without a New Driveway

BEFORE — standing water — Standing Water — Solved Without a New Driveway
BeforeBEFORE — standing water
BEFORE — water against the driveway — Standing Water — Solved Without a New Driveway
BeforeBEFORE — water against the driveway
DURING — drainage going in — Standing Water — Solved Without a New Driveway
DuringDURING — drainage going in
AFTER — water gone — Standing Water — Solved Without a New Driveway
AfterAFTER — water gone

The client wasn't ready for a new driveway — they just wanted the water gone.

Manalapan, NJ

Downspouts Buried — Water Away From the Foundation

BEFORE — downspout dumping at the foundation — Downspouts Buried — Water Away From the Foundation
BeforeBEFORE — downspout dumping at the foundation
DURING — trenching the line across the lawn — Downspouts Buried — Water Away From the Foundation
DuringDURING — trenching the line across the lawn
INSTALL — pipe and pop-up emitter going in — Downspouts Buried — Water Away From the Foundation
DuringINSTALL — pipe and pop-up emitter going in
AFTER — finished lawn, emitter flush in the grass — Downspouts Buried — Water Away From the Foundation
AfterAFTER — finished lawn, emitter flush in the grass

The downspouts were dumping roof water right at the foundation. We trenched in solid pipe lines, bedded the pop-up emitter in clean stone so any leftover water drains instead of freezing, and put everything back clean.

Jackson, NJ

Trench Drain Replaced — Pitched to Move Water

BEFORE — where the old drain sat, full of water instead of moving it — Trench Drain Replaced — Pitched to Move Water
BeforeBEFORE — where the old drain sat, full of water instead of moving it
DURING — cutting the new channel — Trench Drain Replaced — Pitched to Move Water
DuringDURING — cutting the new channel
INSTALL — tying in the pipe — Trench Drain Replaced — Pitched to Move Water
DuringINSTALL — tying in the pipe
AFTER — new drain set at proper pitch in the pool deck — Trench Drain Replaced — Pitched to Move Water
AfterAFTER — new drain set at proper pitch in the pool deck

The old trench drain never worked — it wasn't pitched to move water. We replaced it with a new drain set at the proper pitch, carrying water away from the pool deck.

Point Pleasant, NJ

French Drain to a Flow Well — Patio Flooding Solved

DURING — lining the trench with filter fabric — French Drain to a Flow Well — Patio Flooding Solved
DuringDURING — lining the trench with filter fabric
INSTALL — clean stone over the fabric — French Drain to a Flow Well — Patio Flooding Solved
DuringINSTALL — clean stone over the fabric
INSTALL — catch basin set in stone — French Drain to a Flow Well — Patio Flooding Solved
DuringINSTALL — catch basin set in stone
AFTER — lawn restored, basin flush and ready — French Drain to a Flow Well — Patio Flooding Solved
AfterAFTER — lawn restored, basin flush and ready
One year later — dry patio, healthy lawn. — French Drain to a Flow Well — Patio Flooding Solved
AfterOne year later — dry patio, healthy lawn.

The patio sat lower than the rest of the property and flooded every heavy rain. We installed a large French drain with multiple pipes, all tied into an underground flow well — problem solved.

Old Bridge, NJ — 2019

Buried Downspouts to the Street

BEFORE — downspout connected to PVC at the foundation — Buried Downspouts to the Street
BeforeBEFORE — downspout connected to PVC at the foundation
DURING — pipe laid in the trench — Buried Downspouts to the Street
DuringDURING — pipe laid in the trench
INSTALL — gravel bed under the pipe — Buried Downspouts to the Street
DuringINSTALL — gravel bed under the pipe
DURING — long pipe run, crew at work — Buried Downspouts to the Street
DuringDURING — long pipe run, crew at work
DURING — pipe in the water-filled trench — Buried Downspouts to the Street
DuringDURING — pipe in the water-filled trench
BEFORE — water collecting in the trench — Buried Downspouts to the Street
BeforeBEFORE — water collecting in the trench
AFTER — pipe exiting through the curb to the street — Buried Downspouts to the Street
AfterAFTER — pipe exiting through the curb to the street

Downspouts dumping at the foundation. We tied them into solid PVC and ran buried lines all the way out through the curb to the street — so roof water leaves the property instead of soaking the yard.

Jackson, NJ — 2022

Drainage to the Curb

InstallBoring under the sidewalk — no cutting, no patching.
BEFORE — trench dug from the house to the curb — Drainage to the Curb
BeforeBEFORE — trench dug from the house to the curb
Pipe going in, emitter box at the curb — Drainage to the Curb
DuringPipe going in, emitter box at the curb
Curb emitter outlet — Drainage to the Curb
DuringCurb emitter outlet
Emitter close-up — Drainage to the Curb
DuringEmitter close-up
AFTER — finished lawn restored over the trench — Drainage to the Curb
AfterAFTER — finished lawn restored over the trench

Water had nowhere to go. We trenched from the house to the curb, ran buried pipe to a curb emitter — then restored the lawn over it.

Jackson, NJ — 2024

French Drain with Pop-Up Emitter

BEFORE — trench and pipe, tractor with stone — French Drain with Pop-Up Emitter
BeforeBEFORE — trench and pipe, tractor with stone
Crew laying pipe with geotextile fabric — French Drain with Pop-Up Emitter
DuringCrew laying pipe with geotextile fabric
Crew laying pipe in fabric-lined trench — French Drain with Pop-Up Emitter
DuringCrew laying pipe in fabric-lined trench
Pop-up emitter in gravel bed with fabric — French Drain with Pop-Up Emitter
DuringPop-up emitter in gravel bed with fabric
Trench overview with pipe — French Drain with Pop-Up Emitter
DuringTrench overview with pipe
Digging the pit — French Drain with Pop-Up Emitter
DuringDigging the pit
Trench with pipe run — French Drain with Pop-Up Emitter
DuringTrench with pipe run
Pipe run toward house — French Drain with Pop-Up Emitter
DuringPipe run toward house
AFTER — driveway stone bed work area — French Drain with Pop-Up Emitter
AfterAFTER — driveway stone bed work area

A full French drain build — nonwoven geotextile fabric, clean stone bed, and a pop-up emitter so the line drains instead of freezing.

Jackson, NJ — 2020

Drilling Through Hard-Pack

Hard-Pack Crust: Why Your Yard Holds Water — soil cross-section diagram
DiagramHow it works — drill through the crust to reach the draining sand.
Hard-Pack Correction: NDS Flow Well System — soil cross-section diagram
DiagramThe fix — Y-trench and perforated pipe feed NDS flow wells that release water into the sand below.
Y-Shaped French Drain — Cross Section: fabric-wrapped stone, perforated pipe, topsoil and sod
DiagramHow we build it — Y-shaped trench, fabric-wrapped stone, perforated pipe at the bottom, topped with topsoil and sod.
System Layout — Top View: French drain laterals and NDS flow wells
DiagramSystem layout — French drain laterals feed the center line, with NDS flow wells at each end.
Worker with auger drilling in trench — Drilling Through Hard-Pack
DuringWorker with auger drilling in trench
Trench walls showing the hard-pack layer — Drilling Through Hard-Pack
DuringTrench walls showing the hard-pack layer
Close-up of drilled hole through the crust — Drilling Through Hard-Pack
DuringClose-up of drilled hole through the crust
Trench cut through the hard-pack layer — note the dense orange crust in the walls. — Drilling Through Hard-Pack
DuringTrench cut through the hard-pack layer — note the dense orange crust in the walls.
Drilling through the crust with the auger — stone going in next. — Drilling Through Hard-Pack
DuringDrilling through the crust with the auger — stone going in next.
Close-up: drilled clean through the hard-pack. — Drilling Through Hard-Pack
DuringClose-up: drilled clean through the hard-pack.
The trench filled with water — proof the crust won't let it through. — Drilling Through Hard-Pack
DuringThe trench filled with water — proof the crust won't let it through.
Water standing in the trench before the drainage system went in. — Drilling Through Hard-Pack
DuringWater standing in the trench before the drainage system went in.
Water collecting in the trench around the pipe. — Drilling Through Hard-Pack
DuringWater collecting in the trench around the pipe.
The full 2020 hard-pack correction job site. — Drilling Through Hard-Pack
DuringThe full 2020 hard-pack correction job site.

Topsoil, then a hard-pack crust that water can't get through. We drill through the crust so water reaches the sand below and drains properly.

Jackson, NJ

Drainage

Stock photo — Downspout dumping water at the foundation — washing out beds and pooling against the house. — Drainage
BeforeStock photo — Downspout dumping water at the foundation — washing out beds and pooling against the house.
Stock photo — Water intrusion leads to mold on basement walls. — Drainage
BeforeStock photo — Water intrusion leads to mold on basement walls.
Stock photo — Foundation crack caused by poor drainage. — Drainage
BeforeStock photo — Foundation crack caused by poor drainage.
Stock photo — Water leaking through a foundation crack. — Drainage
BeforeStock photo — Water leaking through a foundation crack.
Stock photo — How gutter and downspout problems lead to foundation issues. — Drainage
BeforeStock photo — How gutter and downspout problems lead to foundation issues.

Stock photos showing what happens everywhere when roof water isn't carried away from the house — all of it preventable.

Jackson, NJ

The Yard That Wouldn't Drain

Why it wouldn't drain — hard-pack crust over draining sand — annotated soil layers
DiagramWhy it wouldn't drain — hard-pack crust over draining sand
Full system: French drain laterals feeding two NDS Flo-Wells — The Yard That Wouldn't Drain
InstallFull system: French drain laterals feeding two NDS Flo-Wells
Stone columns drilled through the hard-pack into the sand — The Yard That Wouldn't Drain
DuringStone columns drilled through the hard-pack into the sand
First 24-inch NDS Flo-Well set in stone — The Yard That Wouldn't Drain
InstallFirst 24-inch NDS Flo-Well set in stone
Center junction tie-ins — The Yard That Wouldn't Drain
InstallCenter junction tie-ins
Second 24-inch NDS Flo-Well being set — The Yard That Wouldn't Drain
InstallSecond 24-inch NDS Flo-Well being set
Fresh screened topsoil going back — The Yard That Wouldn't Drain
DuringFresh screened topsoil going back
Organic compost raked over the topsoil — The Yard That Wouldn't Drain
DuringOrganic compost raked over the topsoil
Finished: seed and hay tack — The Yard That Wouldn't Drain
AfterFinished: seed and hay tack

A standalone side-yard drainage system in Jackson, NJ. The yard held water because the ground under the topsoil is hard pack packed like concrete — in 13 yards of soil we removed, there was not one worm, grub, or insect. We drilled stone columns down through the hard pack into the sand all along the system, so the water drains freely at the bottom: 104 ft of French drain laterals feeding two center lines into two 24-inch NDS Flo-Wells, 15 tons of clean stone, the whole system wrapped in nonwoven geotextile fabric. Finished with clean sand, fresh screened topsoil topped with organic compost, seed and hay tack. Drainage Pros — We can help. (732) 995-4834